DDASaccident598

Document Type

Other

Creative Commons License

Creative Commons License
This work is licensed under a Creative Commons Attribution-Noncommercial-No Derivative Works 4.0 License.

Publication Date

4-1-2008

Keywords

DDAS, 2008, Afghanistan, excavation, PMN-2, AP

Abstract

It is the conclusion of investigation team that the involved deminer was excavation a signal in an area where the ground surface was hard with dense vegetation, and considering the crater created as a result of the explosion it seems that the deminer was excavating the signal about 30 cm on right side of the working lane where he was not in a stable position for excavating the signal by scraper; the excavation of this lane required to be done in next clearance lane.

This document is currently not available here.