DDASaccident598
Document Type
Other
Creative Commons License
This work is licensed under a Creative Commons Attribution-Noncommercial-No Derivative Works 4.0 License.
Publication Date
4-1-2008
Keywords
DDAS, 2008, Afghanistan, excavation, PMN-2, AP
Abstract
It is the conclusion of investigation team that the involved deminer was excavation a signal in an area where the ground surface was hard with dense vegetation, and considering the crater created as a result of the explosion it seems that the deminer was excavating the signal about 30 cm on right side of the working lane where he was not in a stable position for excavating the signal by scraper; the excavation of this lane required to be done in next clearance lane.